The trailer has been re-located down next to the cabin. I've got the pressure-treated lumber to build the base. And if my motivation keeps up, I should have it framed in by the end of the summer. Hopefully.
Feb 5, 2011
Scrap Metal
Cleaning up around the yard.
The top square is the aluminum roof from the trailer.
The bottom squares are the tin from under the floor.
No comments:
Post a Comment