I pushed it off to the downhill side.
This will make it easier to work on stripping the roof section.
This is what it looks like from the bathroom end.
The outside bunkbed wall was rotted out ... flimsy.
Next is working on this ...
Removing the refrigerator vent. The pop-up bubble vents (trash).
And separating the skin from the wood.
All the wood goes into the burn pile, the aluminum to recycle.
Leaving the floor to be removed from the trailer ... in due time.
No comments:
Post a Comment